Two-Way Street Conversions

About

In 2015, the City of Jacksonville adopted a revised Community Redevelopment Area (CRA) plan for the Northbank of Downtown, which includes a specific project for the reintroduction of two-way street systems within the Northbank. Subsequent Mobility Plan Updates and other transportation projects have consistently carried forward this directive and funds have been set aside within the CRA to begin implementation.

The return to two way streets and resulting slower speeds are shown to stimulate economic growth and increase property values; facilitate more efficient use of on-street parking and ride share; enhance retail visibility and promote retail occupancy rates and success; improve walkability and increase pedestrian safety and pedestrian activity on the sidewalk; and increase residential demand and perceived quality of life for residents.

Forsyth Street and Adams Street are both identified as streets prioritized within the CRA Plan for two-way conversion. Segments of both streets lie within DIA’s targeted dining districts and their conversion to two-way streets complements other public and private redevelopment efforts.

The design phase of this project is underway.

Category

Directions

Category